welded pipe

Short Description:

Standard: ASTM, JIS, GB, AISI, DIN, BS

MOQ:1ton

Certificate:ISO9001、BV、SGS

Processing Services: unwinding, punching, cutting

Price Clause:FOB、CIF、CFR、EX-WORK

Type: Stitched or seamless

———————————————-

Whatsapp:+86 13132112333

Email: tgjy88@gmail.com


Product Detail

Product Tags

Specifications

Production Steel Pipe
Standard API 5L, API 5CT, SY/T5037, SY/T5040, GB/T9711.1,GB/T9711.2, A, B, X42-X80, L175-L555,L245NB, etc.
Material 1.0033,08F,A53,A106,Q235,Q345b,
Out Diameter 159mm-3200mm
Wall Thickness 3mm-30mm
Length 5.8m-11.8m,or as customer's requirements.
Main Market Middle East,Africa,South-east Asia,USA,Canada,South America
Technique SAW, ERW welyading etc.
Usage 1. Piling project

2. Heat-supply project

3. Conveying drinking water,drainage,coal gas,fuel gas,mine slurry and other low & middle pressure fluids

4. API5L Petroleum and natural gas pipeline

5. Chemistry industry

6.Electric power engineering circulating pipe

Package 1.Bundle packing or in bulk

2. Bevelled or plain ends as per buyer's request

3. Marks: as per customer's request

4. Surface treatment: with or without varnish/2PP/2PE/3PE/3PP/FBE coating

5. Metal or plastic protecting caps at pipe ends

Delivery Time about 20days after receipt of irrevocable L/C at sight or 30% deposit T/T
Other products 1.Spiral welded steel pipe

2.LSAW steel pipe

3.ERW steel pipe

4. Casing pipe

External Coating FBE, 2PE, 3PE,3PP etc.
Pipe end Plain end, beveled end, PVC covered and both ends capped ,threaded and coupled

Application

   1.Most underground pipelines are used for transportation, underground water is extracted during Gai Lou, and boiler hot water is used for transportation.

    2.Machining, bearing sleeves, machining mechanical parts, etc.

    3. Electrical: gas transmission and water power generation fluid pipeline.

    4 .Anti-static tubes of wind power plants.

1
3
2
4

Stable delivery time

If products is in stock , we can delivery after received deposit about 7-15days.

If you need customization service,  100tons goods need 20-25days , 100-300 tons goods need 40-50days ,exceed 300 tons goods need 60 days.

Product packaging material selection is for protect products better.

5
6

  • Previous:
  • Next:

  • Write your message here and send it to us