ASTM A572 High Strength Steel I Beam

Short Description:

H-beam, because all parts are arranged at right angles, so H-beam has the advantages of strong bending resistance, simple construction, cost saving and light structure in all directions, and is widely used in large buildings (such as workshops, high-rise buildings, bridges, etc.). , ships, lifting and transporting machinery, equipment foundations, supports, foundation piles, etc.).

Our Promise:
1.Give the most competitive price
2. ISO certified excellent manufacturer
3. Third party inspection: SGS, CE, etc
4. Sufficient inventory,Fast delivery
5. long price validity
6.Professional and perfect after-sales support team

——————————————–

Whatsapp:+86 13132112333

Email: tgjy88@gmail.com


Product Detail

Product Tags

Product Process

High(H) 100mm-900mm
Flange width(B) 100mm-300mm
Web thickness(t1) 6mm-16mm
Flange thickness(t2) 8mm-28mm
Length 6-12m/pc or as your request
Standard AISI, ASTM, BS, DIN, GB, JIS etc.
Material SS400, Q 235B,S235JR,Q345B, S355JR etc.
Technique Hot rolled & Welded

Industrial structure of the steel structure bearing bracket.

  1. 2.Underground engineering steel pile and retaining structure.
  2. 3.Petrochemical and electric power and other industrial equipment structure
  3. 4.Large span steel bridge components
  4. 5.Ships,machinery manufacturing frame structure 6.The train, automobile, tractor beam bracket
  5. 7.Port of conveyor belt, high speed damper
  6. bracket
01
07
02
08

The section of I beam is a long steel strip in I-shape. I-shaped steel is divided into hot-rolled I-shaped steel and light I-shaped steel. Grade: gb/en/jis/astm and so on. 

I-beams are mainly  used as steel frame columns in steel structures and as frame beams in frame structures under dynamic loads.We can accept product customization and the packaging is bundle.                                                                           

03
04

Stable delivery time

If products is stock , about 7-10days can delivery after received deposit.

If custom products ,  100tons about 20-25days , exceed 100tons within 300tons about 40-50days , exceed 300tons, within 60days .

Product packaging material selection, good protection products

Our products are packaged in bundles, or as per your requirements.

05
06

  • Previous:
  • Next:

  • Write your message here and send it to us