Seamless Steel Tube

Short Description:

P235GH STB410 boiler pipe

MOQ:1 tons

Grade:Q235, Q345, Q195, 10#, 20#, 45#, 16mn, API J55, STPG42, ST37, ST52, 15Mo3, 16Mo, 16Mo3, 15MnV, Q195-Q345, 10#-45#, 16mn, API J55-API P110, STPG42, ST35-ST52, MO, Mn-V alloy

Surface Treatment:Black,galvanize,spray lacquer

End protector:Plastic Pipe Cap

Sample:available

—————————————————

Whatsapp:+86 13132112333

Email: tgjy88@gmail.com


Product Detail

Product Tags

Specifications

Product Name Carbon Seamless Ms Steel Pipe
Standard ASTM A106, ASTM A53, API 5L Gr.B, DIN17175,DIN1629
Outer Dia: 20mm-610mm
Wall Thickness 4mm-70mm
Dia Tolerance Control with in the standard, OD:+-1%, WT:+-10%
Materials 10#,20#, 45#,16Mn,A106(B,C),A53(A,B),API J55,API K55,Q235,Q345,ST35.8,ST37,ST42,ST45,ST52
Inspection ISO,BV,SGS,MTC
Packing Waterproof paper, and steel strip packed. Standard Export Seaworthy Package.Suit forall kinds of transport,or as required
Supply Ability 1000 metric tons/month
MOQ 5metric ton,sample order accepted
Shipment time Within 7-10 workdays after receiving deposit or L/C
Payments T/T,LC

Carbon steel seamless steel pipe is a kind of long steel. The steel pipe has a hollow section and is widely used as a pipeline for transporting fluids, such as pipelines for transporting oil, natural gas, gas, water and certain solid materials. Compared with solid steel such as round steel, steel pipe has the same bending and torsional strength, and is lighter in weight. It is an economical section steel and is widely used in the manufacture of structural parts and mechanical parts, such as oil drill pipes, automobile transmission shafts, Bicycle racks and steel scaffolding used in building construction, etc.

1. Made of high-quality materials, it lasts for a long time and works well

2. The pipe diameter is uniform and the quality is good

3. In the production process, a double etching process is adopted

4. Reuse of chemical properties

11
33
22
44

Stable delivery time

If products is in stock , we can delivery after received deposit about 7-15days.

If you need customization service,  100tons goods need 20-25days , 100-300 tons goods need 40-50days ,exceed 300 tons goods need 60 days.

Product packaging material selection is for protect products better.

55
66

  • Previous:
  • Next:

  • Write your message here and send it to us